WHAT TO DOCUMENT
Share the details that shape the work.
Measure the widest visible flare near ground level, show the complete stump and access route, and explain nearby structures, utilities, cleanup expectations, and the intended next use.
Planning factors
- Widest diameter and root flare
- Wood condition and visible roots
- Access, barriers, and nearby structures
- Chip volume, cleanup, and finish
Prepare the request
- Measure at the widest point near grade
- Photograph the full flare and access route
- Identify windows, vehicles, hardscape, and utilities
- Describe the intended finish
Scope boundaries
- A provider confirms equipment fit and available depth
- Grinding does not guarantee complete root-system removal
- Duration and price require project review
Use the widest visible diameter and identify the number of stumps or root sections.
Include wide context, close detail, access, obstacles, and the planned finish area.
Describe the intended result, desired depth, cleanup preference, and timing.
Review Abbotsford request areas
